1. CONSULTATION AND INITIAL PLANNING
In our experience it is important that we be involved in the early
planning stage with any system of significance. This process enables
us to tailor the system to fulfill its initial objectives, while
making provision for future expansion and modifications. We often
find that we are able to provide useful ideas to our clients - ideas
that they may not have considered previously or perhaps were unaware
that they could be incorporated. The balance of this work phase is
devoted to:
- An
examination of the functional attributes of each room, or area;
-
Identification of the types of equipment for the area, and the
level of integration required to facilitate automation within the
home or building;
- Defining
zones of common functionality;
- Preliminary
assessment of current and future needs for the system.
2. DESIGN
Following the consultation process floor plan drawings and equipment
lists are developed. Included with these drawings is specifications
for structural accommodations, including; shelving, cabinetry,
conduit, and enclosures. Adjustments are made and incorporated into
the drawings based upon client review. Final sign-off of the design
serves as the basis for ordering equipment, parts, materials and
scheduling installation.
| Audio Plan |
Conduit Plan |
Cabling Plan |
 |
 |
 |
3. PRE-WIRE
Pre-wire is the installation of the low voltage wiring and cabling.
This work phase is scheduled after the AC electrical has been
completed and before dry walling begins. During this phase, the
equipment racks , backboards and junction boxes are installed in the
control room in order to secure the cabling in position prior to the
installation of other systems, walls and finishes.
4. EQUIPMENT
The equipment phase will include recommendation and selection of
system components. A short list of equipment, meeting or exceeding
spec, is created, prior to finalizing the decision, on which
components are most suitable. Ultimately, an equipment-ordering
schedule is supplied to allow for sufficient lead-time to ensure
on-time installation.
5.
EQUIPMENT INSTALLATION
Dictated by the overall schedule, the installation of equipment is
coordinated with other trades. For example, cabling for hidden
speakers for P.A. systems or background music will be installed
under drywall so that they are not visible and must be in place
before the drywall trades arrive. Other equipment, such as screens
for video projection is installed after the paint trades, while
touch screens facilitating full automation are the last items to be
installed.
6. PROGRAMMING AND TESTING
Some programming is completed prior to installation at the client
site. Once installed, all systems are tested and validated.
7.
TRAINING AND DOCUMENTATION
After final trim out and testing, on site training is arranged for
the home owner. Documentation is completed and provided with
owner manuals and warranty documents.
8. LONG TERM SERVICE ORIENTATION
Technetron takes a long-term service approach to clients and their
homes or offices. For example, remote maintenance and
troubleshooting can be accomplished through the use of
TCP/IP-enabled devices throughout the home or building. These
devises can be accessed for most programming related updates,
maintenance, and service from any location via a secure website.
For commercial
applications we offer clients the choice of training their own
designated on-site staff (building operators, a/v operators, IT
staff, etc.). The staff is trained to replace a malfunctioning part
or component, making the integration controls essentially
plug-and-play when they are used in conjunction with TCP/IP-enabled
devices.
After
commissioning the completed installation, Technetron provides
technical updates as the technology evolves. Our staff, working on
line, can usually fix any programming problems, or requests for
changes. Technetron also offers a tailor made Maintenance Contract
for on-going service, offering the option of 24-hour emergency
loaner exchange for any equipment failures that may occur.
|